Procurement 2009
In March 2008, a first local meeting was held to assess the scope of the renovation of the cemetery wall. The construction company Zettler Bau, Memmingen received the order.
In 2009, MicroPore dehumidified plaster was carried out ® the refurbishment.
Moisture in the masonry could be repaired as part of a refurbishment with MicroPore dehumidification plaster 2009
MicroPore dehumidification cleaning ® was processed under difficult weather conditions, such as heat, heavy rain in frequent alternation without any problems. The short drying times between the second and third plastering layer are advantageous. The last cover layer was designed with MicroPore dehumidification plaster ® in white.